Based in Yorkshire, working across the UK · Mon–Fri 8am–5pm · Breakdown cover by arrangement Call 01226 699390 · Urgent breakdown? Report it 24/7
Home › Loading bay monitoring › How it works

How loading bay monitoring works

The same lorry twice: with bay monitoring and key handover, then the same bay without bay monitoring. When both have played we'll take you to the details.

Skip to bay monitoring ›
YORKSHIRE BAYS LOADING BAY ENGINEERS DRIVERS DRIVERS PLEASE WAIT HERE Your bay shows on the TV. Keys stay at goods-in. COFFEE KEYS GOODS IN LOADING BAY 07:42
Step 1

An empty bay, ready for the next lorry

Outside light green: a driver may reverse on. Inside light red: the door stays shut.

Loading bay monitoring – the details › Get a quote

Talk to an engineer.

Equipment broken down? Report it in two minutes. Anything else – servicing, quotes, questions – send a general enquiry.

Urgent breakdown General enquiry