Based in Yorkshire, working across the UK · Mon–Fri 8am–5pm · Breakdown cover by arrangement Call 01226 699390 · Urgent breakdown? Report it 24/7

Bay Monitoring System Build and Testing in Barnsley

Yorkshire Bays spent a weekend building and testing its new bay monitoring system, with control and PLC updates, hot spare failover and a local add-on that keeps working without internet.

This weekend our engineers spent their time building and testing our new bay monitoring system in Barnsley. A monitoring system is only useful if it keeps working when a site is busy and when something goes wrong, so reliability was the focus of the work.

What we worked on

The work covered several areas:

  • Building and testing the new bay monitoring system
  • Updating the control side of the system
  • Updating the PLC (programmable logic controller) programming
  • Adding more fetches to the system to make it more reliable
  • Adding hot spare failover
  • Adding a local site add-on that works without an internet connection

There were a few other smaller changes as well, but those were the main items.

Hot spare failover

A hot spare is a second, standby part of the system that is kept ready to take over if the main one fails. Failover is the switch from one to the other. The idea is that a single fault should not leave a loading area without monitoring. We have built this into the new system and tested it as part of the weekend's work.

Working without the internet

Many monitoring systems depend on a connection to the internet, so a dropped line can mean losing visibility of the bays. To deal with this, we have added a local site add-on. It is designed so that the system carries on working when the internet isn't available.

For anyone running a yard or loading area, this matters. Broadband and mobile connections do drop out, and the bays still need to operate safely when they do.

Control and PLC updates

The PLC and control updates sit behind the monitoring. The PLC is the controller that deals with the equipment on site, and the control updates were made alongside the monitoring build so the two work together. We also added more fetches to the system, which is aimed at making it more reliable in day-to-day use.

What this means for site managers

The aim of this work is a bay monitoring system that is more dependable, whether that means a component failing or the internet going down. Testing is an important part of that, and we would rather find problems in a controlled build than on a customer's site.

If you manage loading bays in Barnsley or across Yorkshire and want to know more about our bay monitoring, get in touch with Yorkshire Bays to talk it through.

Talk to an engineer.

Equipment broken down? Report it in two minutes. Anything else – servicing, quotes, questions – send a general enquiry.

Urgent breakdown General enquiry